Here you can follow the whole routine of building your new holiday home and see up close all the details and curiosities that happen in Lagoinha.

Follow, share, show to everyone!
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
VIDEO OF THE MONTH FOR YOU TO WATCH!
Follow here everything that happened in the construction of your new holiday home this past month.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
EXCAVATIONS FROM BLOCK D
Excavations reach even very deep levels. Compared to the previous photos, here the space is already much wider and in the next post we make here, it will be totally different.

In this image, we see water pumps working to remove the water accumulated in the process of lowering the water table.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
ANALYSIS OF THE HOTEL STRUCTURE
Here, the hotel structure is analyzed and tested. Safety first always!
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
MANUFACTURE OF FOUNDATIONS ‘SHOES
These parts are essential for sustaining the construction and they are produced at the site of our work.

Soon they will be executed in the space that has been excavated.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
PROTECTION WALL
The entire work is surrounded with a concrete wall or with siding, to prevent people and onlookers from entering the site, after all, the construction site is a place that requires care and safety.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
BLOCK D EXCAVATIONS BEGIN
The last stage of heavy construction began and is with the construction of the annex building. The images show the beginning of the excavation process, to reach the necessary depth for the building’s foundations.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
CONCRETE COTS
The size of this work can be measured by the amount of ducts and shackles spread over the development’s land.

At this stage, they arrived in front of the land, to build the concrete cradles that support the shackles.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
Execution of drain boxes
After installing the shackles, now it is time for the drain boxes to be built.
The drain boxes serve as a passage and connect one section of shackles to the others.

While in the 1st photo, the ducts are exposed and the drainage boxes are being built, in the 2nd photo, the shackles are already grounded and the boxes go through the last stage of execution.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
WATCH THE VIDEO OF THE MONTH OF FEBRUARY
If you visited the location of your new vacation home, chances are you have seen some of these new features. But as the project is huge and there is a lot going on in it, here you can get an aerial view of everything that was done in the last month at the Residence Club at the Hard Rock Hotel Fortaleza.

In addition to the posts that we are presenting every detail of what is being done on site, you will have a video of the Evolution of Works every month to watch here. So be sure to follow us and stay on top of everything that happens in Lagoinha.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
DID YOU KNOW? About the shackles …
Our work is so big and demands so many materials, that to facilitate the processes, we set up a shackle factory inside our construction site.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
Laying the drain shackles
Here we show the shackles for draining water already installed!

In the first moment, the opening of the passage for the installation of the shackles and in the second photo, the long duct of the shackles finished.
Share on facebook
Share
Share on linkedin
Share
Share on whatsapp
Share
CONCEPT STORE SÃO PAULO
Avenida Brasil, 1964
Jardim América – São Paulo/SP
CEP: 01430-001
Brasil
CONCEPT STORE FORTALEZA
Avenida Desembargador Moreira, 1080
Aldeota – Fortaleza /CE
CEP: 60170-001
Brasil
CONCEPT STORE LONDRINA
Avenida Higienópolis, 199
Jardim Higienópolis – Londrina/PR
CEP: 86015-010
Brasil
VCI VILA VELHA
Rua Antônio Ataíde, 1402 – Sala 116
Divino Espírito Santo – Vila Velha/ES
CEP: 29107-200
Brasil
4000 1215    |    atendimento@vcisa.com    |    Política de Privacidade